Kitchen planning guide · Taunton Kitchens
Cabinet Fittings
Cabinet legs and supporting fittings help set the finished height and support of the cabinetry.
Thoughtful choices are easier when fit, function and finish are considered together. Use this guide to shape the conversation before anything is ordered.
A useful starting point
Before you choose
- 01Check compatibility and load requirements for the chosen cabinet.
- 02Set heights against appliances, worktop thickness and the floor.
- 03Leave access for adjustment and follow installation instructions.
Set the cabinet height from the finished floor
Cabinet fittings in this context are supporting legs and height-adjustment components, not door hinges. Their role is to establish a level cabinet run on a floor that may not be level. Plan from the finished floor surface, including any flooring still to be laid, and relate cabinet height to the intended worktop build-up. The aim is a consistent finished work surface while retaining the adjustment that the cabinet system specifies.
- Measure the floor at the cabinet run rather than assuming it is level.
- Include the planned worktop thickness in the finished-height calculation.
- Confirm the cabinet system's specified leg and support arrangement.
Coordinate legs with plinths and appliances
The adjustable support height influences the visible plinth space and the relationship between cabinet fronts and nearby appliances. Compare the proposed height with the dishwasher opening, appliance doors and any floor transition. A plinth can conceal support components, but should not prevent required ventilation or future access. Check dimensions against the actual appliance installation information and cabinet plan before fixing the finished line.
- Check appliance door movement at the intended cabinet height.
- Relate the leg adjustment range to the planned plinth detail.
- Keep any required appliance ventilation clear.
Choose compatible support, not a visual substitute
Legs, clips and adjustment parts need to suit the cabinet construction and its stated support requirements. Do not select by appearance or by a nominal size alone; use the cabinet maker's instructions for the exact unit and configuration. Where a run, island or end panel changes how loads are carried, confirm the intended support plan with the kitchen designer or installer. Decorative posts and plinth details should not be assumed to carry structural loads.
- Match components to the exact cabinet system.
- Ask how support is arranged at ends, corners and islands.
- Do not infer structural capability from a decorative finish.
Preserve adjustment access for accurate fitting
The fitting sequence should allow cabinets to be levelled and aligned before the final worktop and plinth details are settled. Discuss how the supports will remain reachable if later adjustment or inspection is needed. Avoid enclosing adjustment points behind a permanently fixed decorative piece without understanding the consequences. Keep the fitting instructions with the kitchen records, and confirm the finished floor condition before final adjustment is signed off.
- Agree when the final floor level will be established.
- Check whether plinth sections can be removed for access.
- Retain the product instructions for future maintenance.